Purpose-built for Indian job shops

Stop running your shop
on |

Shoptrak captures production data shift-by-shift — so your WIP, idle costs, and delivery status are always live, never a day old.

1-day setup No ERP dependency Mobile-ready operators
shoptrak.in/dashboard Live
Live OEE 84.2%
Efficiency 92.4%
Idle Cost Today ₹2,100
PartStageTodayStatus
Ram Catcher T1Turning318 pcs On Plan
Body V3VMC35 pcs Lagging
Bracket K7Turning120 pcs On Plan
Body V3 — Code 240 idle: load not fed from T1 stage
Production_Tracker_v7_FINAL.xlsx Last saved: yesterday, 11:42 PM
Stale
₹0 avg idle cost recovered / month
0 hrs daily Excel admin time eliminated
0 day average implementation time
0+ idle reason codes tracked
The Problem

The Hidden Cost of Stale Data

When operators record labor on paper or hours later, cost reports are wrong, WIP is unclear, and every management decision is based on yesterday.

Stale Data = Bad Margins

Night shift inefficiency costs ₹12,000 — but it's invisible in your reports until the next morning, already locked in.

WIP Is Always a Guess

You know what was planned. You almost never know what's actually at each stage, today, right now — until the month-end shock.

Delivery Promises Built on Hope

Without live completion data, every commit to a customer is an estimate. Shoptrak gives you RAG status per batch — before they call.

The Shoptrak Workflow

Six Modules. One Continuous Pipeline.

Data entered once flows everywhere. No duplication. No re-keying. Click any module to see exactly what it does.

01

Part Master

Parts, rates & stages

02

Monthly Plan

Capacity auto-computed

03

Daily Production Log

Live shift-by-shift KPIs

06

WIP & Delivery

RAG status per batch

05

Idle Hours Tracker

15 codes, OEE by machine

04

Daywise Progress

31-day completion matrix

    A Day in the Shop

    What Changes When Your Data is Live

    ❌ Before Shoptrak

    Production Manager arrives. Opens 3 Excel files. Spends 90 minutes compiling last night's numbers manually. Numbers are already 10 hours old.

    "I never know if the data is right until something goes wrong."
    ✅ With Shoptrak

    Production Manager opens Shoptrak dashboard. Daywise Progress is live. Sees Body V3 is 22 pieces behind plan — flags it to supervisor. Done in 10 minutes.

    Daywise Progress Live KPIs
    ❌ Before Shoptrak

    Operators fill in paper logbooks. Some forget. Others estimate. Shift supervisor collects sheets at 5 PM, types them into Excel. Data is already stale and incomplete.

    "Half the logbook entries are wrong — operators don't remember exact times."
    ✅ With Shoptrak

    VMC-01 operator logs: Machine, Part, Stage, Qty. Done in under 60 seconds on the mobile form. KPIs update instantly. Shift supervisor sees live efficiency without asking anyone.

    Daily Production Log Mobile entry
    ❌ Before Shoptrak

    VMC machine sits idle for 2 hours because T1 turning hasn't fed parts yet. Nobody records this. Nobody knows. ₹750/hr is silently wasted. Discovered at month-end.

    "We find out about idle time when it's already done — never in time to fix it."
    ✅ With Shoptrak

    Idle Hours entry filed: Code 240 — prev-stage bottleneck. System shows Inefficiency Value = ₹1,500. Bottleneck alert fires. Supervisor re-routes work in 20 minutes.

    Idle Hours Tracker Code 240 Alert
    ❌ Before Shoptrak

    Customer calls: "Is our batch ready?" Works Manager checks Excel, guesses. Says "probably Friday." Customer escalates on Thursday. Batch is actually 3 days behind.

    "Every delivery promise is a guess. We just hope the customer doesn't notice."
    ✅ With Shoptrak

    WIP screen: Body batch — ⚠ Shortfall of 22. Not ready Friday. Manager calls customer proactively on Wednesday, offers revised date with evidence. No surprise. No escalation.

    WIP & Delivery RAG Status
    6 Core Modules

    Every Module Feeds the Next

    Click a module to explore what it captures, what it calculates, and what decision it enables.

    Module 01

    One Source of Truth for Every Part You Make

    When your part rates, stage sequences, and cycle times live in separate Excel files, every production plan starts with errors already baked in.

    • Add parts per customer with up to 8 stages (Turning or VMC)
    • Cycle time and stage count auto-compute capacity in hours and shifts
    • Price vs Value (Time × MHR) comparison — see which parts are worth making
    • Part Master changes don't affect historical plans (snapshot integrity)
    "Before Shoptrak, we had 3 different Excel files for part rates. Now Part Master is the single source — and nothing downstream gets a stale number."
    Part Master — KTC Automotive 12 parts
    PartStagesCycle TimeMHR ₹
    Ram Catcher T148.5 min180
    Body V3614.2 min375
    Bracket K735.1 min180
    Flange M2511.8 min375
    Module 02

    Plan the Month in Minutes. Know Capacity Before You Commit.

    Most shops build their monthly plan on a whiteboard or a guess. By the time you discover you're short on VMC capacity, you've already promised the delivery.

    • Select parts from Part Master — rate, stages, cycle times auto-fill
    • Turning and VMC capacity auto-computed in hours and machine-days
    • Week diff check — forces week totals to match batch qty before publishing
    • Customer-wise sales value breakdown with share %
    "We used to spend half a day building the monthly plan in Excel. Now it takes 20 minutes and the capacity calculation is automatic."
    April Plan — SummaryCapacity OK
    Turning Hours312 hrs
    VMC Hours186 hrs
    Sales Value₹4.2L
    Week-wise VMC load
    W1
    72%
    W2
    88%
    W3
    65%
    W4
    94%
    Module 03

    Every Shift. Every KPI. Calculated Live.

    Operators log output as it happens — not hours later. Efficiency, quality, and inefficiency cost in ₹ are calculated the moment the entry is saved.

    • Machine, part, stage, output qty — done in under 60 seconds
    • Inefficiency Value (₹) calculated per shift, per machine
    • Quality (acceptance) % tracked separately from efficiency
    • Midnight crossover handled automatically — no manual adjustment
    "Operators complete entries in under 1 minute per shift segment. The data is there before I've had my morning tea."
    VMC-01 — Shift Log
    Part:Body V3
    Stage:VMC Machining
    Output:35 pcs
    Efficiency:82.4%
    Inefficiency ₹:₹ 3,200
    Efficiency below threshold — Supervisor notified
    Module 04

    See Every Stage, Every Day — in One View.

    The Daywise Progress tracker is a 31-day matrix showing cumulative accepted quantity per stage per day. You see the drift before it becomes a crisis.

    • Day × part × stage completion matrix — 31 days at a glance
    • Cumulative tracking — no mental math needed
    • Flag lagging parts before the customer calls
    • Auto-feeds into WIP & Delivery readiness calculation
    "I open this screen every morning at 8:45 AM. I know which parts need attention before the first machine starts."
    Daywise — Body V3
    StageD1D2D3D4D5
    Turning4896144192240
    VMC4080109138155
    Deburr4078105128148
    On planLaggingCritical
    Module 05

    ₹ Value on Every Idle Hour. Bottleneck Found Before It Escalates.

    15 idle reason codes including Code 240 (prev-stage bottleneck). Every idle entry becomes a rupee cost on your weekly OEE report.

    • 15 coded idle reasons (tooling, power, material, prev-stage, etc.)
    • Code 240 alert: bottleneck detection — flags which upstream stage is starving the next
    • OEE calculated per machine per week
    • Monthly idle cost in ₹ — shows exactly where to improve
    "We found ₹18,000/month in idle time we didn't know existed. Code 240 alerts changed how we schedule the floor."
    Idle Analysis — April
    C-240Prev-stage bottleneck14.5 hrs₹5,437
    C-100Tooling change / setup9.2 hrs₹3,450
    C-060Material not available6.8 hrs₹2,550
    C-020Power outage3.0 hrs₹1,125
    Total idle cost: ₹18,232 / month
    Module 06

    Delivery Readiness, Not Delivery Hope.

    The WIP & Delivery screen shows you exactly which batches are ready, which are lagging, and by how much — 3 days before the customer calls.

    • RAG flags (Ready / At-risk / Shortfall) per batch
    • Exact shortfall number — not "we're behind", but "22 pieces short"
    • Completion % auto-calculated from Daywise Progress
    • Call customers proactively — not reactively
    "We went from 4 missed deliveries per quarter to zero. The WIP screen tells us 3 days in advance if something won't be ready."
    WIP & Delivery — April
    Ram Catcher T1
    96%
    Ready
    Body V3 — Batch 1
    62%
    ⚠ -22 pcs
    Bracket K7
    100%
    Ready
    Flange M2 — Batch 2
    31%
    ⛔ Not ready
    Free OEE Calculator

    Calculate Your Shop's Hidden Idle Cost

    Enter your numbers below. See your OEE score and monthly idle cost in ₹ — instantly, no email required.

    Your Shop Setup

    1102030

    This Month's Numbers

    02468
    40%60%80%100%
    ₹100₹375₹800

    Your Results

    Your OEE Score
    -- OEE
    Industry benchmark: 65% OEE
    Monthly idle cost ₹0
    Annual idle cost ₹0
    Shoptrak ROI (Starter plan) --
    See How to Fix This — Book Demo
    Shoptrak vs Excel

    Your "Free" Excel System Costs ₹58,000/Month

    Excel admin time₹15,625
    +
    Wrong delivery decisions₹25,000+
    +
    Undetected idle time₹18,000+
    =
    Your "free" Excel₹58,625/mo
    vs
    Shoptrak starts at₹X,XXX/mo
    📊 Excel ⚡ Shoptrak
    Data entry timing❌ End of shift / next day✅ Shift-by-shift, as it happens
    KPI calculation❌ Manual formula, often wrong✅ Auto-calculated, immutable
    Stage-level tracking❌ Not possible✅ Day × part × stage matrix
    Idle reason analysis❌ Impossible✅ 15 coded reasons, OEE report
    WIP visibility❌ Month-end only✅ Live, cumulative, by stage
    Delivery readiness❌ Estimated✅ Exact shortfall per batch
    Multi-user access❌ File locking conflicts✅ Role-based, concurrent
    Mobile operator entry❌ Not practical✅ Mobile-responsive form
    Customer Stories

    Shops That Made the Switch

    ★★★★★

    "From 3 hours of Excel reporting daily to a 10-minute morning review. I know which parts are behind before 9 AM — not when the customer calls at 5 PM."

    RK
    Rajesh KumarProduction Manager, CNC Shop, Bangalore
    ★★★★★

    "We found ₹18,000/month in idle time we didn't know existed. Code 240 alerts showed us exactly which stage was starving the next one."

    SI
    Suresh IyerDirector, Precision Engineering, Pune
    ★★★★★

    "We went from 4 missed deliveries per quarter to zero. The WIP screen tells us 3 days in advance if something won't be ready."

    AV
    Anand VenkatWorks Manager, Auto Components, Chennai
    Book a Free Demo

    See Shoptrak on
    Your Own Data.

    We'll use your actual part list, your machine setup, and your monthly plan — not a generic walkthrough.

    No sales pressure
    45-minute demo
    📹 Recording sent afterwards
    🚀 1-day implementation if you proceed

    We respond within 24 hours on business days.